Search

NL
E
  • HOME
    • HISTORY
    • DIVISIONS
      • Frijns Steel Construction
      • Frijns Projects
      • Frijns Plaatligger Produkties
      • Frijns Metaalwerken
    • DEMANDS
      • Quality
      • Safety
      • Certification
    • VISION
    • WORKSHOP
      • Valkenburg
      • Maastricht
      • Venray
    • REFERENCES
  • CUSTOMERS
    • OIL & GAS
      • Qatar Petroleum
    • PETROCHEMY
      • DSM Netherlands
      • Vopak Hamburg
      • Stork Technical Services
    • CEMENT
      • Lehigh Cement U.S.A.
      • ENCI Nederland
    • ENERGY
      • Nuon Power Buggenum
    • UTITLITY BUILDING
      • Bikemax Sinfeldingen
      • Artifort
      • HSL Utrecht
    • PROCESS
      • Sphinx Netherlands
      • ArcelorMittal
      • Jacobs Engineering Netherlands
  • PROJECTS
    • CHIMNEY APERAM GENK (B)
    • FlY OVER A2/A79 MAASTRICHT (NL)
    • CAST.BEAMS FRIJNS PLAATL. PROD. (NL)
    • CLAUSCENTRALE MAASBRACHT (NL)
    • VOPAK HAMBURG (G)
    • LAURA METAAL MAASTRICHT (NL)
    • ARTIFORT MAASTRICHT (NL)
  • STRENGTHS
    • ENGINEERING
    • FABRICATION
    • BLASTING & PAINTING
    • ERECTION
    • WALL- & ROOFCLADDING
    • PROJECT MANAGEMENT
  • PRODUCTS
    • STEEL STRUCTURES
    • COMPOSITE GIRDERS
    • INDUSTRIAL PLANT
    • WALL- & ROOFCLADDING
    • STAIRS- & WALKWAYS
    • SPECIALS
  • NEWS & PRESS
    • NEWSFACTS
      • Fly-over A2/A79 Maastricht
      • Various steel structures
      • 145 tons of castellated beams
      • 10.000 m2 extra capacity
    • NEWSLETTERS
      • Newsletter 8
      • Newsletter 7
      • Newsletter 6
      • Newsletter 5
    • RACING (SOON)
      • Events
      • Sponsoring
  • VACANCIES
    • Junior Planner
    • Steel Construction Estimator
  • CONTACT
    • Frijns Steel Construction
    • Frijns Projects
    • Frijns Plaatligger Produkties
    • Frijns Metaalwerken

COMPOSITE GIRDERS

DESCRIPTION
Where integrated girders are used, pre-fabricated hollow-core beam floor slabs are positioned between girders, not on top of the steel structure. This achieves thinner flooring thicknesses that lead to significant savings especially in multi-storey buildings. Integrated girders are cast in situ together with the hollow-core floor slabs, which means that they also have a higher fire-resistance. 
Additional fire-resistant coatings can be applied very easily and technical plant mounted very simply thanks to its flat bottom flange. A logistical advantage is also gained because girders are produced from hot-rolled steel strips and plate. Availability of these standard materials is far higher and customers are not limited to standard trade dimensions. Frijns Plaatligger Produkties can produce virtually any size of girder to customer specifications subject only to the limitations of its welding machinery. After welding operations, attachments and openings can be incorporated, as well as any anti-corrosion treatment required for the construction phase.