Search

NL
E
  • HOME
    • HISTORY
    • DIVISIONS
      • Frijns Steel Construction
      • Frijns Projects
      • Frijns Plaatligger Produkties
      • Frijns Metaalwerken
    • DEMANDS
      • Quality
      • Safety
      • Certification
    • VISION
    • WORKSHOP
      • Valkenburg
      • Maastricht
      • Venray
    • REFERENCES
  • CUSTOMERS
    • OIL & GAS
      • Qatar Petroleum
    • PETROCHEMY
      • DSM Netherlands
      • Vopak Hamburg
      • Stork Technical Services
    • CEMENT
      • Lehigh Cement U.S.A.
      • ENCI Nederland
    • ENERGY
      • Nuon Power Buggenum
    • UTITLITY BUILDING
      • Bikemax Sinfeldingen
      • Artifort
      • HSL Utrecht
    • PROCESS
      • Sphinx Netherlands
      • ArcelorMittal
      • Jacobs Engineering Netherlands
  • PROJECTS
    • CHIMNEY APERAM GENK (B)
    • FlY OVER A2/A79 MAASTRICHT (NL)
    • CAST.BEAMS FRIJNS PLAATL. PROD. (NL)
    • CLAUSCENTRALE MAASBRACHT (NL)
    • VOPAK HAMBURG (G)
    • LAURA METAAL MAASTRICHT (NL)
    • ARTIFORT MAASTRICHT (NL)
  • STRENGTHS
    • ENGINEERING
    • FABRICATION
    • BLASTING & PAINTING
    • ERECTION
    • WALL- & ROOFCLADDING
    • PROJECT MANAGEMENT
  • PRODUCTS
    • STEEL STRUCTURES
    • COMPOSITE GIRDERS
    • INDUSTRIAL PLANT
    • WALL- & ROOFCLADDING
    • STAIRS- & WALKWAYS
    • SPECIALS
  • NEWS & PRESS
    • NEWSFACTS
      • Fly-over A2/A79 Maastricht
      • Various steel structures
      • 145 tons of castellated beams
      • 10.000 m2 extra capacity
    • NEWSLETTERS
      • Newsletter 8
      • Newsletter 7
      • Newsletter 6
      • Newsletter 5
    • RACING (SOON)
      • Events
      • Sponsoring
  • VACANCIES
    • Junior Planner
    • Steel Construction Estimator
  • CONTACT
    • Frijns Steel Construction
    • Frijns Projects
    • Frijns Plaatligger Produkties
    • Frijns Metaalwerken

ENERGY

Project
NUON POWER BUGGENUM NETHERLANDS
Client: Claudius Peters Group Germany
DESCRIPTION
In 2004, Frijns Industrial Group Netherlands realized the construction of a silo and pipe bridge for co-gases of biomass in the clean coal gasification plant, Willem-Alexander, in Buggenum. Incorporation of biomass achieves a CO2 emission reduction of less than 22 percent, compared with 200,000 cars annually. The project included design, fabrication, painting, supply and erection of structural steel and pipe lines for the bridge and the supply and installation of a silo include support steel construction.
The project included design, fabrication, painting, supply and erection of structural steel and pipe lines for the bridge and the supply and installation of a silo include support steel construction.
SPECIFICATIONS
A total of 62 tons of structural steel for the building of the pipe bridge. The construction was provided with a three layer coating system, 1200 mtr pipes DN350 for transport of biomass from the silo to the plant and a 400 mtr nitrogen pipe DN300. Delivery and assembly of the silo for the storage of biomass, with a diameter over 9 mtr and height of 29 mtr. The support steel construction and an access tower supplied with galvanized gratings and platforms with handrails. All welds of the complete pipe work have been X-rayed according to European Standards.